End of day one assembly of the new 12' x 17'building. Viewed: 103 times.
|
| Sitting next to the old 8' x 10' that I've had for about 12 years. I had to winch the building close to 25' to get it out of the way of the new one. Viewed: 96 times.
|
| End of day 2 of assembly. Viewed: 88 times.
|
| Hard to tell from the angle, but it's more than 2X larger than the old one. The front door is a roll up garage door. Viewed: 95 times.
|
|
| | | |
| | | |
 |  |  |  |
End of day 3, it's getting closer. Viewed: 106 times.
|
| Work left to do: second half of the roof, ridge cap, trim, and doors. Viewed: 90 times.
|
| End of day 4, roof and doors installed, still need to install door springs and cables, lock mechanism, and trim. Viewed: 70 times.
|
| Extension cord was for power for a radio, light, and kerosene heater Viewed: 72 times.
|
|
| | | |
| | | |
 |  |  |  |
Complete, except the pile of cardboard that needed gathered for the trash Viewed: 50 times.
|
| Big difference between the old and new buildings. Viewed: 49 times.
|
| Concrete block layout to support skid off the ground. Viewed: 51 times.
|
| Skid made from pressure treated 4x4's. Viewed: 53 times.
|
|
| | | |